After several collaborations with FICOBA, we were entrusted with the renovation of approximately 300 m² of flooring at chef Íñigo Lavado’s restaurant. Some additional plasterboard and painting works were also required.
Removal of the existing floor. Installation of a new floor with a sawn finish, durable and resistant. Complementary carpentry, plasterboard, and painting works. Full compliance with the manufacturer’s recommendations on expansion joints, ensuring durability and warranty coverage.
A precise, high-quality job delivered on time, with a strong, functional, and elegant floor finish.